Consent Decree – Phase 1 – Cedar Grove Basin

Work in these projects will include Gravity Sewer Line remediation in the form of removing and replacing and/or sliplining cured-in-place pipe (CIPP), and/or pipebursting gravity sewer line in sizes ranging from 8 inch to 54 inch. Manhole remediation for these projects including selective rehabilitation, entire rehabilitation, replacement or new manhole installation.

Please refer to the City map for the general location of Phase 1 and then the Phase 1 map for locations of the specific projects. The Cedar Grove Basin has been divided into 29 repair and 3 CIPPL construction packages, ranging in construction estimate from $1,000,000 to over $15,000,000. Construction began first quarter 2016 and all construction for Phase 1 must be complete by November 2017.

Listed below are the current Construction Packages; Designer; Award Amount and Contractor, or Construction Order of Magnitude value.

Please note: Construction starts about three (3) months after Begin Advertising.
Status Consent Decree Project Numbers & Name
Estimated Range & Original Contract
Contractor
Complete Monkhouse & Interstate (1-133) $1,259,423
Wicker
Complete Greenwood Rd & Junior Place (1-134) $1,681,999 Wicker
Being Constructed Standard Oil Road & Wisteria St (1-131) $1,385,350 Wicker
Being Constructed Garden Valley U1:  Louise & W Canal (1-111) $3,081,241 Wicker
Being Constructed Cedar Grove Trunk Main (1-105.108) $6,670,001 Yor Wic
Being Constructed Garden Valley U2: Valley View & Timberview (1-103) $3,624,644
John Plott
Being Constructed Karen & Dollarway (1-112) $1,825,550
Wicker
Being Constructed Joe Louis & Evers (1-114) $3,942,415
Don M Barron
Being Constructed W Canal & Valley View Trunk (1-106.109.110.103) $7,684,503 John Plott
Being Constructed Union Ave & Wallace Ave (1-104.119.142) $6,657,969
John Plott
Being Constructed Wyngate & W 84th (1-102) $5,634,790 S&J
Being Constructed Hollywood & Kennedy (1-116.117.118.139)  $12,681,375
Wicker
Being Constructed Wyngate Blvd & Wallace Ave (1-115.120.127.128.151) $11,019,795
Suncoast
Being Constructed Dowdell St & Fairfield Ave (1-101.125.147.124) $8,360,402 Wicker
Being Constructed Cedar Grove CIPPL (1-201) $7,778,895 Mitchell
Being Constructed Cedar Grove CIPPL (1-202) $9,119,363 Suncoast
Being Constructed Cedar Grove CIPPL (1-203) $11,551,939
SAK
Being Constructed Hearne & Hollywood Ave. (1-161.171.175.176.178.180.141) $11,313,850 Hemphill Construction
Being Constructed Mansfield Rd. & Corbitt (1-162.163.164.165.172.173.174) $4,603,908 S&J
Being Constructed Linwood & Fairfield (1-121.122.123.143.144.145.146) $12,972,603
John Plott
Being Constructed Cedar Grove CIPPL (1-204) $6,732,253 Insituform
Being Constructed Hollywood Ditch & W. 70th (1-106.107.114) $5,439,438 Don M. Barron
Being Constructed Sunset Acres & Cargill (1-113.129.130.152.153.154.109.110.135.132) $13,537,198 Hemphill Construction
Being Constructed Henry & Kennedy (1-138.140.156.169) $4,990,940 PM Const. & Rehab
Being Constructed Meadow Parkway Lift Station $216,060 Dixie Overland
Being Constructed Linwood & Line (1-126.148.149.150.166.167.168) $4,960,880 PM Const. & Rehab
Being Constructed Jewella & Greenwood (1-1175.177.178.179) $3,315,716 PM Const. & Rehab
Being Constructed Jewella & Clarke (1-158.159.160.170) $3,545,006 Pulley Construction
Being Constructed Hollywood & Singletary (1-136.137.157) $5,079,403 Belt Construction
Being Constructed
Cedar Grove & Slack Lift Station $305,000 Dixie Overland