Phase 1
Monkhouse & Interstate (133) | Completed: 1/30/2017
Greenwood Rd & Junior Place (134) | Completed: 1/30/2017
Standard Oil & Wisteria (131) | Completed: 1/30/2017
Garden Valley U1: Louise & W Canal | Completed: 5/16/2018
Cedar Grove Trunk Main (105.108) | Completed: 9/28/2017
Garden Valley U2: (103) | Completed: 8/29/2017
Karen & Dollarway (112) | Completed: 9/25/2017
Joe Lewis & Evers (114) | Completed: 5/16/2018
W Canal & Valley View Trunk (106.109.110.103) | Completed: 2/23/2018
Union & Wallace Ave (104.119.142) | Completed: 12/20/2017
Wyngate Blvd & W 84th (102) | Completed: 2/6/2018
Hollywood & Kennedy (116.117.118.139) | Completed: 2/20/2018
Wyngate Blvd & Wallace Ave (115.120.127.128.151) | Completed: 9/1/2017
Dowdell St & Fairfield Ave (101.125.147.124) | Completed: 1/30/2018
Cedar Grove CIPPL (201) | Completed: 12/8/2017
Cedar Grove CIPPL (202) | Completed: 4/11/2018
Cedar Grove CIPPL (203) | Completed: 12/7/2017
Hearne & Hollywood Ave (161.171.175.176.178.180.141) | Completed: 5/11/2018
Mansfield Rd & Corbitt (162.163.164.165.172.173.174) | Completed: 1/5/2018
Linwood & Fairfield Ave (121.122.123.143.144.145.146) | Completed: 4/7/2018
Cedar Grove CIPPL (204) | Completed: 4/11/2018
Hollywood Ditch & W 70th (106.107.114) | Completed: 2/28/2018
Sunset Acres & Cargill (113.129.130.152.153.154.109.110.135.132) | Completed: 5/4/2018
Meadow Parkway Lift Station | Completed: 1/8/2018
Linwood & Line (126.148.149.150.166.167.168) | Completed: 1/12/2018
Jewella & Greenwood (175.177.178.179) | Completed: 12/30/2017
Jewella & Clarke (158.159.160.170) | Completed: 1/23/2018
Hollywood & Singletary (136.137.157) | Completed: 5/7/2018
Cedar Grove & Slack Lift Station | Completed: 2/1/2018
Kennie Road Lift Station | Completed: 1/6/2015
Cargill Park Lift Station | Completed: 6/22/2016
Water System Projects
Russell Road Water Main Improvements
- City Project Number: 05-F001
- Description: Install approximately 6,000 linear feet of 20" water main from Nash Street to Gain Street and on Russell Road from Gain Street to Old Blanchard Road.
- Phase: Construction
- Design Engineer: CGS
- Contractor: Wicker Construction
- Project Manager: Mark Bates
- Funding Source: 2010 C W&S Bonds
- Estimated Cost: $1,114,625
- Completion Date: April 2015
Cross Lake Dam Vegetation Removal
- City Project Number: 05-E012
- Description: Removal of excessive vegetation and re-seeding.
- Phase: Construction
- Design Engineer: Atchley & Atchley
- Contractor: DRC Emergency
- Project Manager: Rajbarath Panneerselvam
- Funding Source: 2011 GO Bond
- Estimated Cost: $252,249
- Completion Date: April 29, 2015
I-49 and LA-3132 Landscaping Interchanges
- City Project Number: 14-E001
- Description: Design and construction of water main extensions to service irrigation systems at I-49 and LA-3132.
- Phase: Construction
- Design Engineer: AFJMc
- Contractor: Best Yet/Wicker Construction
- Project Manager: Mark Bates
- Funding Source: 1994 A W&S Revenue Bonds
- Estimated Cost: $300,000
- Advertisement Date: N/A
- Completion Date: 2015
Cedar Grove Truck Main Repair
- City Project Number: 11-F002
- Description: Replacement of 10,000 feet of sewer composed of 24-inch, 36-inch and 42-inch pipe.
- Phase: Design
- Design Engineer: Coyle Engineering
- Contractor: CES
- Project Manager: Mark Bates
- Funding Source: 2011 GO Bond
- Estimated Cost: $468,000
- Completion Date: 2015
Kennie Road Lift Station Improvements
- City Project Number: 13-F003
- Description: Replace existing pumps, electric and controls equipment, piping, and valves.
- Phase: Construction
- Design Engineer: CGS
- Contractor: McInnis Brothers Construction
- Project Manager: Rajbarath Panneerselvam
- Funding Source: 2011 GO Bond
- Estimated Cost: $433,835
- Completion Date: January, 6 2015
Amiss Plant 2E
- City Project Number: 11-E001
- Description: Improvements and replacements in Plant No. 1, Plant No. 2E, Lime Building Nos. 1 & 2, the old Coagulant Building and other miscellaneous areas of the plant.
- Phase: Construction
- Design Engineer: AECOM
- Contractor: Max Foote
- Project Manager: Larry Harper
- Funding Source: 2011 GO Bond
- Estimated Cost: $6,305,844
- Completion Date: July 2014
Backflow Preventors-Water Distribution System
- City Project Number: 04-E002
- Description: Installation of backflow prevention/detection equipment and other improvements for the monitoring of the water distribution system.
- Phase: Construction
- Design Engineer: Burk-Kleinpeter, Inc., CDMSmith
- Contractor: McInnis Brothers Construction
- Project Manager: Doug Stump
- Funding Source: 2000 A W&S Revenue Bonds, 2007 W&S Revenue Bonds, Water & Sewer Revenues EPA Grant
- Estimated Cost: $4,479,755
- Completion Date: June 2014
Round Grove Lift Station
- City Project Number: 13-F002
- Description: Replace equipment, piping, valves and SCADA.
- Phase: Construction
- Design Engineer: CGS
- Contractor: JPD
- Project Manager: Andy Glasgow
- Funding Source: DEQ Loan
- Estimated Cost: $106,450
- Completion Date: May 7, 2014