Phase 1

Monkhouse & Interstate (133)  |  Completed: 1/30/2017

Greenwood Rd & Junior Place (134)  |  Completed: 1/30/2017

Standard Oil & Wisteria (131)  |  Completed: 1/30/2017

Garden Valley U1: Louise & W Canal  |  Completed: 5/16/2018

Cedar Grove Trunk Main (105.108)  |  Completed: 9/28/2017

Garden Valley U2: (103)  |  Completed: 8/29/2017

Karen & Dollarway (112)  |  Completed: 9/25/2017

Joe Lewis & Evers (114) | Completed: 5/16/2018

W Canal & Valley View Trunk (106.109.110.103) | Completed: 2/23/2018

Union & Wallace Ave (104.119.142) | Completed: 12/20/2017

Wyngate Blvd & W 84th (102) | Completed: 2/6/2018

Hollywood & Kennedy (116.117.118.139) | Completed: 2/20/2018

Wyngate Blvd & Wallace Ave (115.120.127.128.151) | Completed: 9/1/2017

Dowdell St & Fairfield Ave (101.125.147.124) | Completed: 1/30/2018

Cedar Grove CIPPL (201) | Completed: 12/8/2017

Cedar Grove CIPPL (202) | Completed: 4/11/2018

Cedar Grove CIPPL (203) | Completed: 12/7/2017

Hearne & Hollywood Ave (161.171.175.176.178.180.141) | Completed: 5/11/2018

Mansfield Rd & Corbitt (162.163.164.165.172.173.174) | Completed: 1/5/2018

Linwood & Fairfield Ave (121.122.123.143.144.145.146) | Completed: 4/7/2018

Cedar Grove CIPPL (204) | Completed: 4/11/2018

Hollywood Ditch & W 70th (106.107.114) | Completed: 2/28/2018

Sunset Acres & Cargill (113.129.130.152.153.154.109.110.135.132) | Completed: 5/4/2018

Meadow Parkway Lift Station | Completed: 1/8/2018

Linwood & Line (126.148.149.150.166.167.168) | Completed: 1/12/2018

Jewella & Greenwood (175.177.178.179) | Completed: 12/30/2017

Jewella & Clarke (158.159.160.170) | Completed: 1/23/2018

Hollywood & Singletary (136.137.157) | Completed: 5/7/2018

Cedar Grove & Slack Lift Station | Completed: 2/1/2018

Kennie Road Lift Station  |  Completed: 1/6/2015

Cargill Park Lift Station  |  Completed: 6/22/2016

Water System Projects



Russell Road Water Main Improvements


  • City Project Number: 05-F001
  • Description: Install approximately 6,000 linear feet of 20" water main from Nash Street to Gain Street and on Russell Road from Gain Street to Old Blanchard Road.
  • Phase: Construction
  • Design Engineer: CGS
  • Contractor: Wicker Construction
  • Project Manager: Mark Bates
  • Funding Source: 2010 C W&S Bonds
  • Estimated Cost: $1,114,625
  • Completion Date: April 2015

Cross Lake Dam Vegetation Removal


  • City Project Number: 05-E012
  • Description: Removal of excessive vegetation and re-seeding.
  • Phase: Construction
  • Design Engineer: Atchley & Atchley
  • Contractor: DRC Emergency
  • Project Manager: Rajbarath Panneerselvam
  • Funding Source: 2011 GO Bond
  • Estimated Cost: $252,249
  • Completion Date: April 29, 2015

I-49 and LA-3132 Landscaping Interchanges


  • City Project Number: 14-E001
  • Description: Design and construction of water main extensions to service irrigation systems at I-49 and LA-3132.
  • Phase: Construction
  • Design Engineer: AFJMc
  • Contractor: Best Yet/Wicker Construction
  • Project Manager: Mark Bates
  • Funding Source: 1994 A W&S Revenue Bonds
  • Estimated Cost: $300,000
  • Advertisement Date: N/A
  • Completion Date: 2015

Cedar Grove Truck Main Repair


  • City Project Number: 11-F002
  • Description: Replacement of 10,000 feet of sewer composed of 24-inch, 36-inch and 42-inch pipe.
  • Phase: Design
  • Design Engineer: Coyle Engineering
  • Contractor: CES
  • Project Manager: Mark Bates
  • Funding Source: 2011 GO Bond
  • Estimated Cost: $468,000
  • Completion Date: 2015

Kennie Road Lift Station Improvements


  • City Project Number: 13-F003
  • Description: Replace existing pumps, electric and controls equipment, piping, and valves.
  • Phase: Construction
  • Design Engineer: CGS
  • Contractor: McInnis Brothers Construction
  • Project Manager: Rajbarath Panneerselvam
  • Funding Source: 2011 GO Bond
  • Estimated Cost: $433,835
  • Completion Date: January, 6 2015

Amiss Plant 2E


  • City Project Number: 11-E001
  • Description: Improvements and replacements in Plant No. 1, Plant No. 2E, Lime Building Nos. 1 & 2, the old Coagulant Building and other miscellaneous areas of the plant.
  • Phase: Construction
  • Design Engineer: AECOM
  • Contractor: Max Foote
  • Project Manager: Larry Harper
  • Funding Source: 2011 GO Bond
  • Estimated Cost: $6,305,844
  • Completion Date: July 2014

Backflow Preventors-Water Distribution System


  • City Project Number: 04-E002
  • Description: Installation of backflow prevention/detection equipment and other improvements for the monitoring of the water distribution system.
  • Phase: Construction
  • Design Engineer: Burk-Kleinpeter, Inc., CDMSmith
  • Contractor: McInnis Brothers Construction
  • Project Manager: Doug Stump
  • Funding Source: 2000 A W&S Revenue Bonds, 2007 W&S Revenue Bonds, Water & Sewer Revenues EPA Grant
  • Estimated Cost: $4,479,755
  • Completion Date: June 2014

Round Grove Lift Station


  • City Project Number: 13-F002
  • Description: Replace equipment, piping, valves and SCADA.
  • Phase: Construction
  • Design Engineer: CGS
  • Contractor: JPD
  • Project Manager: Andy Glasgow
  • Funding Source: DEQ Loan
  • Estimated Cost: $106,450
  • Completion Date: May 7, 2014