![]() |
| NEWS HOME | HOME | CITIZENS | VISITORS | BUSINESS | DEPARTMENTS |
![]() |
Office of Communications Gwen Campbell Media, Community & Education Relations Tel. 318.673.5062 / Fax: 318.673.5087 gwen.campbell@ci.shreveport.la.us | ||
The City of Shreveport is experiencing periods of low water pressure, particularly in the summer months in South and Southeast Shreveport.. We have identified a critical water pressure zone as the area bounded by Linwood Avenue to the west, Flournoy-Lucas Road to the north and Bayou Pierre to the east. | The City has three water main projects that together will address the low pressure issues throughout this area. They are 1) A new 24 inch main along the Southern Loop with a 16 inch connection along Linwood and along Wallace Lake Road to Flournoy-Lucas Road; 2) A new 60 inch water main from the Amiss Plant to connect to the existing 60 inch main at West College; 3) A new 36 inch water transmission main along the Inner Loop (LA 3132) from Walker Road to the Industrial Loop, to include a new water booster station and ground storage facility in the area of Slack Industrial Park. These three projects will be complete by the 1st quarter of 2009. | In the interim, beginning tomorrow Tuesday May 15th we are asking that the residents within this zone comply with a voluntary water conservation program to run from May 15th to October 1st for this year and 2008. | This voluntary conservation program will limit residential and commercial irrigation to odd and even days only, based on the property street address. | We ask for your cooperation in this regard for the benefit of all residents within this zone. | For more information, contact DOS City Engineer Ron Norwood at: 673 -6000. | # # # |
|