Completed Projects
Water System Projects

Russell Road Water Main Improvements 
  • City Project Number: 05-F001
  • Description: Install approximately 6,000 linear feet of 20" water main from Nash Street to Gain Street and on Russell Road from Gain Street to Old Blanchard Road.
  • Phase: Construction
  • Design Engineer: CGS
  • Contractor: Wicker Construction
  • Project Manager: Mark Bates
  • Funding Source: 2010 C W&S Bonds
  • Estimated Cost: $1,114,625
  • Completion Date: April 2015

Cross Lake Dam Vegetation Removal

  • City Project Number: 05-E012
  • Description: Removal of excessive vegetation and re-seeding.
  • Phase: Construction
  • Design Engineer: Atchley & Atchley
  • Contractor: DRC Emergency
  • Project Manager: Rajbarath Panneerselvam
  • Funding Source: 2011 GO Bond
  • Estimated Cost: $252,249
  • Completion Date: April 29, 2015

I-49 and LA-3132 Landscaping Interchanges
  • City Project Number: 14-E001
  • Description: Design and construction of water main extensions to service irrigation systems at I-49 and LA-3132. 
  • Phase: Construction
  • Design Engineer: AFJMc
  • Contractor: Best Yet/Wicker Construction
  • Project Manager: Mark Bates
  • Funding Source: 1994 A W&S Revenue Bonds
  • Estimated Cost: $300,000
  • Advertisement Date: N/A
  • Completion Date: 2015

Cedar Grove Truck Main Repair
  • City Project Number: 11-F002
  • Description: Replacement of 10,000 feet of sewer composed of 24-inch, 36-inch and 42-inch pipe.
  • Phase: Design
  • Design Engineer: Coyle Engineering
  • Contractor: CES
  • Project Manager: Mark Bates
  • Funding Source: 2011 GO Bond
  • Estimated Cost: $468,000
  • Completion Date: 2015

Kennie Road Lift Station Improvements
  • City Project Number: 13-F003
  • Description: Replace existing pumps, electric and controls equipment, piping, and valves.
  • Phase: Construction
  • Design Engineer: CGS
  • Contractor: McInnis Brothers Construction
  • Project Manager: Rajbarath Panneerselvam
  • Funding Source: 2011 GO Bond
  • Estimated Cost: $433,835
  • Completion Date: January, 6 2015

Amiss Plant 2E
  • City Project Number: 11-E001
  • Description: Improvements and replacements in Plant No. 1, Plant No. 2E, Lime Building Nos. 1 & 2, the old Coagulant Building and other miscellaneous areas of the plant.
  • Phase: Construction
  • Design Engineer: AECOM
  • Contractor: Max Foote
  • Project Manager: Larry Harper
  • Funding Source: 2011 GO Bond
  • Estimated Cost: $6,305,844
  • Completion Date: July 2014

Backflow Preventors-Water Distribution System
  • City Project Number: 04-E002
  • Description: Installation of backflow prevention/detection equipment and other improvements for the monitoring of the water distribution system.
  • Phase: Construction
  • Design Engineer: Burk-Kleinpeter, Inc., CDMSmith
  • Contractor: McInnis Brothers Construction
  • Project Manager: Doug Stump
  • Funding Source: 2000 A W&S Revenue Bonds, 2007 W&S Revenue Bonds, Water & Sewer Revenues EPA Grant
  • Estimated Cost: $4,479,755
  • Completion Date: June 2014

Round Grove Lift Station
  • City Project Number: 13-F002
  • Description: Replace equipment, piping, valves and SCADA.
  • Phase: Construction
  • Design Engineer: CGS
  • Contractor: JPD
  • Project Manager: Andy Glasgow
  • Funding Source: DEQ Loan
  • Estimated Cost: $106,450
  • Completion Date: May 7, 2014

Clean Water Shreveport